Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptOffices and workspaces · Riyadh · 2026

Corporate Training and Conference Centre in Riyadh

Interior concept for a corporate training and conference centre in Riyadh: a tiered auditorium of about 120 seats with a stage and LED wall, a registration and coffee-break foyer, training rooms with mobile tables and an operable wall, a workshop room with group pods, a boardroom and an AV control room.

A concept designed by Arab Creators, not a built project.

Auditorium Corporate Training and Conference Centre in Riyadh · Interior concept
Foyer Corporate Training and Conference Centre in Riyadh · Interior concept
Training room Corporate Training and Conference Centre in Riyadh · Interior concept
Workshop room Corporate Training and Conference Centre in Riyadh · Interior concept
Boardroom Corporate Training and Conference Centre in Riyadh · Interior concept
Control room Corporate Training and Conference Centre in Riyadh · Interior concept
Detail Corporate Training and Conference Centre in Riyadh · Interior concept
Material palette Corporate Training and Conference Centre in Riyadh · Interior concept

Materials and details

  • Walnut acoustic slats
  • Teal seat fabric
  • Light oak veneer
  • Charcoal carpet tile
  • Writable wall panels
  • Black acoustic felt

Design idea

A training centre serves different sizes in a single day: a conference for 120, rooms for 20, workshops for small groups and a board meeting. We design it to flex with operable walls and furniture on castors, in warm materials that make a long day comfortable.

Sound and vision

Acoustic treatment with walnut slats and an acoustic ceiling, studied sight lines in the auditorium, a control and simultaneous interpretation room, and screens and cameras for video meetings in every room. Cable and power routes are designed before finishes.

Operation

A registration foyer that holds attendees before sessions, a break area close to the rooms, storage for furniture and equipment, and exits and fire protection to Civil Defense requirements.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Training centre film
Training centre reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: