Architecture and interior conceptRetail and shops · Riyadh · 2026
Luxury Men's Grooming Lounge in Riyadh
Interior concept for a luxury men's barbershop and grooming lounge in Riyadh: a floor of four leather chairs with backlit round mirrors on a green marble wall, a marble reception, a hair wash area, a private VIP room and a retail display.
A concept designed by Arab Creators, not a built project.
Materials and details
- Dark green marble
- Smoked oak
- Cognac leather
- Brushed brass
- Green and cream terrazzo
- Ribbed glass
Design idea
A men's grooming lounge is now somewhere a client spends an hour, not ten minutes. We design a calm experience in heavy, warm materials: green marble, oak, leather and brass, with face-directed light at every mirror.
Operation and hygiene
Clear routes between reception, chairs and basins, easy-clean surfaces around stations, power, water and drainage at every station and basin, good ventilation and hidden storage for towels and tools.
Privacy and VIP room
A private single-client room with a sliding door for VIP clients and grooms, and a retail corner near reception that adds value to each visit.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.
Build and upkeep
Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.
How we apply it to your project
We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.
Video
More concepts
- Private Home Cinema in a Riyadh Villa
- Luxury Villa Kitchen in Riyadh with Two Kitchens: Show and Cook
- Contemporary Family Istiraha in Riyadh
- Luxury Wedding Hall in Riyadh
- Luxury Residential Tower Amenities in Riyadh
- Luxury Ladies Salon and Spa in Riyadh
- Specialty Coffee Roastery Cafe in Riyadh
- Premium Fitness Club in Riyadh
- Luxury Oud and Perfume Boutique in Riyadh
- Najd-Inspired Boutique Hotel in Riyadh
- Villa Master Suite in Riyadh
- Dental Clinic in Riyadh
- Contemporary Najdi Majlis in a Riyadh Villa
- Engineering Consultancy Office in Riyadh
- Startup Office in Riyadh with Products Available in Saudi Arabia
- Luxury Car Showroom, Riyadh
- Private Banking Centre, Riyadh
- Tech Company Headquarters, Riyadh
- Family Office, Riyadh
- Real Estate Sales Gallery, Riyadh
- Law Firm Office, Riyadh
- Coworking Space, Riyadh
- Fine Dining Restaurant, Riyadh
- Executive Diwan, Riyadh
- Jewellery Boutique, Riyadh
- Private Istiraha, Riyadh
- Boutique Hotel, Riyadh
- Modern Luxury Villa, Riyadh
- Specialist Clinic, Riyadh
- Arab Creators Studio, Cairo
- Neoclassical Palace, Riyadh
- Corporate Headquarters, Riyadh
- Contemporary Najdi Palace, Riyadh
- Contemporary Palace, Riyadh
- Andalusian Palace, Riyadh
- Private Palace, Riyadh
- Sky Penthouse
- Contemporary Najdi Villa
- Specialty Coffee House
- Engineering Consultancy Office
- Red Sea Coastal Villa
- Stone and Timber Villa
- Contemporary Najdi Majlis
- Courtyard House
- Double-height Living Room
- Salmani Residential Tower
- Mashrabiya Lattice Office Tower
- Hijazi Boutique Hotel
- Healing Architecture Hospital
- Contemporary Najdi Mosque
- Najdi Open-Air Souq
- International School Campus
- Salmani Government Headquarters
- Formal Majlis
- Family Living Room
- Dining Room with Arched Niches
- Master Bedroom Suite
- Dressing Room
- Powder Room in Onyx
- Entrance Foyer with Double Stair
- Kitchen with Travertine Island
- Design concepts
Want a concept for your project?
Send the drawing or site photos and we reply with a quote within one working day.
