Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptEducation and community · Riyadh · 2026

Premium Children's Nursery in Riyadh

Interior concept for a premium children's nursery in Riyadh: a playroom with arched birch play houses, a parent reception with a viewing window, a quiet nap room, child-size washrooms, an art and sensory room and a shaded outdoor play courtyard.

A concept designed by Arab Creators, not a built project.

Playroom Premium Children's Nursery in Riyadh · Interior concept
Reception Premium Children's Nursery in Riyadh · Interior concept
Nap room Premium Children's Nursery in Riyadh · Interior concept
Washrooms Premium Children's Nursery in Riyadh · Interior concept
Art room Premium Children's Nursery in Riyadh · Interior concept
Outdoor courtyard Premium Children's Nursery in Riyadh · Interior concept
Detail Premium Children's Nursery in Riyadh · Interior concept
Material palette Premium Children's Nursery in Riyadh · Interior concept

Materials and details

  • Birch plywood with rounded corners
  • Cork flooring
  • Sage rubber flooring
  • Sage and sand paint
  • White solid surface
  • Acoustic felt panels

Design idea

A nursery is a child's second home. We design calm spaces in soft natural colours and warm timber, with everything at child scale: shelves, basins, mirrors and doors, so children move and learn independently and safely.

Safety first

Rounded corners on all furniture, impact-absorbing soft floors, low-emission paints and materials, safe windows and viewing panels so parents and staff can see into rooms. Emergency exits and fire protection are designed to Civil Defense requirements.

Summer in Riyadh

A courtyard shaded by a sail canopy with rubber surfacing, misting lines for cooling, and indoor rooms with daylight and curtains to control the sun.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Nursery film
Nursery reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: