Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptHospitality and hotels · Riyadh · 2026

Presidential Suite in a Five-Star Riyadh Hotel

Interior concept for a presidential suite in a five-star Riyadh hotel: a living room overlooking the city skyline, a dining room behind a Najdi-patterned bronze screen, a master bedroom, a bathroom with a freestanding tub by the window, an Arabic majlis for guests and a dressing room.

A concept designed by Arab Creators, not a built project.

Living room Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Dining Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Bedroom Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Bathroom Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Majlis Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Dressing room Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Detail Presidential Suite in a Five-Star Riyadh Hotel · Interior concept
Material palette Presidential Suite in a Five-Star Riyadh Hotel · Interior concept

Materials and details

  • Pale oak veneer
  • Brushed bronze
  • Travertine
  • Sand boucle
  • Deep green velvet
  • Wool rug

Design idea

A presidential suite combines staying and receiving in one place. We design it with quiet luxury and warm natural materials, and add Saudi identity through the Najdi bronze screen and an Arabic majlis for guests.

Privacy and routes

A clear split between the receiving zone (living, dining and majlis) and the private zone (bedroom, bathroom and dressing), a separate service entrance for hospitality, and acoustic separation between rooms.

Delivering in hotels

Finishes that stand up to daily hotel use, coordination with the operator and its standards, and work in an occupied building on a schedule that keeps disturbance to guests low.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Presidential suite film
Presidential suite reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: