Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptVillas and palaces · Riyadh · 2026

Executive Home Office in a Riyadh Villa

Interior concept for an executive home office in a Riyadh villa: a smoked oak desk with a leather top, a lit library wall, a meeting corner, a reading nook, a considered video-call backdrop, a small majlis for receiving visitors and a built-in coffee bar.

A concept designed by Arab Creators, not a built project.

Study Executive Home Office in a Riyadh Villa · Interior concept
Meeting corner Executive Home Office in a Riyadh Villa · Interior concept
Reading nook Executive Home Office in a Riyadh Villa · Interior concept
Video calls Executive Home Office in a Riyadh Villa · Interior concept
Guest majlis Executive Home Office in a Riyadh Villa · Interior concept
Coffee bar Executive Home Office in a Riyadh Villa · Interior concept
Detail Executive Home Office in a Riyadh Villa · Interior concept
Material palette Executive Home Office in a Riyadh Villa · Interior concept

Materials and details

  • Smoked oak
  • Cognac leather
  • Travertine
  • Patterned wool rug
  • Bronze
  • Warm grey fabric

Design idea

A decision-maker's home office is a place to work and to receive. We design it calm and private, away from the movement of the house, in warm materials and comfortable light for long working hours.

Remote work

A considered video-call backdrop, soft front lighting, acoustic comfort from rugs, curtains and books, and hidden data and power in the desk and shelving.

Receiving and privacy

An entrance from the guest side without passing through the house, a small majlis for visitors and a built-in coffee bar so there is no need to go to the kitchen.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Home office film
Home office reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: