Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Architecture and interior conceptHealth and care · Riyadh · 2026

Premium Dermatology and Aesthetics Clinic in Riyadh

Interior concept for a premium dermatology and aesthetics clinic in Riyadh: a reception with a fluted desk and backlit onyx wall, an arched corridor with hidden lighting, equipped treatment rooms, a doctor's consultation room, a private VIP suite and a skincare retail corner.

A concept designed by Arab Creators, not a built project.

Reception Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Treatment corridor Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Treatment room Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Consultation room Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
VIP suite Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Retail corner Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Detail Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept
Material palette Premium Dermatology and Aesthetics Clinic in Riyadh · Interior concept

Materials and details

  • White fluted solid surface
  • Brushed champagne-gold metal
  • Backlit cream onyx
  • Travertine
  • Ivory boucle fabric
  • Cream and blush terrazzo

Design idea

An aesthetics clinic sells trust before treatment. We design calm, bright spaces in soft materials, arches and indirect light so patients feel at ease from the moment they enter.

Health requirements

Easy-to-disinfect surfaces in treatment rooms, a hand-wash basin in every room, separation of clean routes from medical waste routes, and ventilation suited to laser equipment, with Ministry of Health and Civil Defense requirements reviewed before construction.

Privacy

Corridors that keep patients apart, a VIP suite with its own entry and lounge, acoustically separated consultation rooms and comfortable waiting away from treatment rooms.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Prices from the retailers' official websites on 28 November 2026, including VAT, excluding delivery, assembly and finishing works. Prices may change; we update them on every project.

Build and upkeep

Furniture is ready-made and assembled in days, and finishing works (timber wall, flooring, ceiling, electrical) are designed and built to suit the space. We confirm showroom availability before ordering.

How we apply it to your project

We design the project on your space and brief in a 3D model, then deliver construction drawings, details and material and quantity schedules, and follow the build on site. Our published interior design rate is 150 SAR per m² and a 3D view is 350 SAR, excluding VAT. Details on interior design and architectural design.

Video

Aesthetics clinic film
Aesthetics clinic reel

More concepts

Want a concept for your project?

Send the drawing or site photos and we reply with a quote within one working day.

Request a quote Estimate the cost

: