Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Selected projects

Selected projects

28 selected projects spanning architectural and interior design, 3D visualisation, structural works, finishing and ornament, from the founding team's careers in Saudi Arabia, drawn from more than 50 projects the team has worked on. Items marked "design proposal" or "3D visualisation" are design work; execution is not implied. Select an image to view it larger, or a project name to open its page.

Also browse the portfolio gallery: selected images grouped by type of work.

Project register as a table

Where we work

Map of Arab Creators work locations in Saudi Arabia and Egypt RiyadhDelivery base Al-Khobar1 project Jazan2 projects CairoHead office

Cairo hosts the engineering office; Riyadh is our delivery base; further work in Al-Khobar and Jazan. Click a city to show its projects.

Riyadh
Delivery base
14 projects
Al-Khobar
1 project
Jazan
2 projects
Cairo
Head office
-

Project gallery

Living room from the interactive project deliveryNewInteractive project deliveryA living room on one page: 3D model, 6 options, 13 drawing sheets, finishes and cost summary.Open the showcase Facade of the sample villa in the 3D tourNew3D villa tour from your planFacade, site plan, furnished rooms and approximate quantities from the same plan, on our own sample villa.Open the tour

Design and visuals Gypsum and Acoustic Ceilings for an Opera House in Diriyah Diriyah · 2026
Advertising Corporate identity and stationery for a business services company in Jubail Stationery and vector logo · Jubail · 2026
Advertising Diya Al-Tameer brand identity and launch kit Brand identity and launch kit · Riyadh · 2026
Advertising Corporate identity and print-ready stationery Identity and stationery · Cairo and Riyadh · 2026
Advertising Project signboard: design, 3D visuals and structural calculations Design and calculations · Eastern Province · 2026
Ornament & facades Classical ornament in gypsum and GRC Private palace · Riyadh · 2024
Ornament & facades Classical palace with central dome Architectural works · Riyadh · 2023
Structure Concrete frame for a multi-storey tower Private developer · Riyadh · 2026
Structure Steel beams and cantilevers Private developer · Riyadh · 2025
Ornament & facades Circular portico with fluted Ionic columns Finishing stage
Shop drawings & modelling 3D model of a curved steel canopy 3D model · Advance Steel
Structure Curved concrete stair rising to the slab opening Concrete frame stage
Finishing Marble and feature lighting in a luxury villa Private client · Riyadh · 2026
Interiors Café interior, designed and built Turnkey · Riyadh · 2025
Finishing Waterjet-cut marble floors in a private palace Private client · Riyadh · 2026
Finishing Turnkey fit-out of a private villa Private client · Riyadh · 2025
Interiors Head office in a contemporary industrial style Private client · Riyadh · 2026
Interiors Timber tiered seating with upholstered cushions Private client · Riyadh · 2026
Finishing Executive office with a metallic-texture wall and glass partitions Corporate office
Finishing Crystal wave feature in a double-height lobby Office building
Finishing Marble and gilding in a palace interior Private client · Riyadh · 2023
Structure Arched concrete frames Private developer · Riyadh · 2024
Finishing Villa landscape & hardscape Private client · Riyadh · 2024
Structure Structural shell of a private palace Private client · Riyadh · 2025
Structure Slab reinforcement with the concrete pump ready to pour Concrete frame stage · Riyadh
Ornament & facades Triangular GRC panel with a glazed light and faceted relief Facade under construction
Interiors Open-plan workspace in a corporate office Interior design proposal · Al-Khobar · 2026
Interiors Feature walls and architectural lighting in a corporate office Interior design proposal · Al-Khobar · 2026
Design & 3D visualisation Dangerous-goods inspection shed, 3D visualisation 3D visualisation · Jazan · 2026
Design & 3D visualisation Aerial view of truck circulation at a dangerous-goods inspection shed 3D visualisation · Jazan · 2026
Interiors Café with a curved timber ceiling and display walls Turnkey · Riyadh · 2025
Interiors Head office reception area Private client · Riyadh · 2026
Finishing Reception lounge Corporate office
Design & 3D visualisation Pool and courtyard for a private villa Design & 3D visualisation · Private villa
Design & 3D visualisation Timber decking and landscape around a villa pool Design & 3D visualisation · Private villa
Interiors Reception majlis in a head office Private client · Riyadh
Industrial & rope access Port crane repainting by rope access Industrial facility · Jazan

Images may not be republished without permission. Client names are withheld for privacy.

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts