Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Home / Selected projects / Project register

Project register

Every project published on this site in one table, grouped by type of work. Each row gives the scope, client type, city and year, and the project name opens its page with photos and details. Private clients are not named, and a company is named only with its permission.

View projects with photos

published projects28
work categories9
cities and regions5
years of work2023 - 2026

Interiors · Structure · Advertising · Ornament & facades · Finishing · Shop drawings & modelling · Technical study and pricing · Design & 3D visualisation · Industrial & rope access

Interiors (3)

ProjectScopeClientCityYear
Interior design proposal for an Al-Khobar corporate officeInterior design proposalNot publishedAl-Khobar2026
Riyadh head office in a contemporary industrial styleNot publishedPrivate clientRiyadh2026
Café interior, designed and builtTurnkeyNot publishedRiyadh2025

Structure (5)

ProjectScopeClientCityYear
Concrete frame for a multi-storey towerNot publishedPrivate developerRiyadh2026
Structural shell of a private palaceNot publishedPrivate clientRiyadh2025
Steel beams and cantileversNot publishedPrivate developerRiyadh2025
Arched concrete framesNot publishedPrivate developerRiyadh2024
Villa structural works: curved stair, raft and slabsReinforced-concrete frameNot publishedNot publishedNot published

Advertising (4)

ProjectScopeClientCityYear
Corporate identity and stationery for a business services company in JubailVector logo in three versions and 6 stationery itemsA business services company, JubailNot published2026
Corporate identity and print-ready stationeryInDesign, IllustratorArab Creators (our own identity)Not published2026
Diya Al-Tameer brand identity and launch kitLogo, guidelines, 23-page profile, social media, website and stationeryDiya Al-Tameer Company, RiyadhNot published2026
Project signboard: design, 3D visuals and structural calculations3000 x 3420 mm, two facesNot publishedEastern Province, Saudi Arabia2026

Ornament & facades (4)

ProjectScopeClientCityYear
Classical ornament in gypsum and GRCNot publishedPrivate palaceRiyadh2024
Classical palace with central domeArchitectural worksNot publishedRiyadh2023
Classical palace facade: rotunda and stone claddingStone facades and classical elementsNot publishedNot publishedNot published
GRC facade feature panel on a steel sub-frameGRC panel and fixing frameNot publishedNot publishedNot published

Finishing (7)

ProjectScopeClientCityYear
Marble and feature lighting in a luxury villaNot publishedPrivate clientRiyadh2026
Waterjet-cut marble floors in a private palaceNot publishedPrivate clientRiyadh2026
Turnkey fit-out of a private villaNot publishedPrivate clientRiyadh2025
Villa landscape & hardscapeNot publishedPrivate clientRiyadh2024
Marble and gilding in a palace interiorNot publishedPrivate clientRiyadh2023
Corporate office fit-outOffice interior fit-outNot publishedNot publishedNot published
Office lobby with a crystal feature and curved ceilingsGypsum ceilings, lighting and crystal featureNot publishedNot publishedNot published

Shop drawings & modelling (1)

ProjectScopeClientCityYear
Curved steel canopy: 3D model and fabrication shop drawings3D model and fabrication drawingsNot publishedNot publishedNot published

Technical study and pricing (1)

ProjectScopeClientCityYear
Gypsum and Acoustic Ceilings for an Opera House in Diriyahgypsum and ceilingsMain contractor (published with permission)Diriyah, Riyadh2026

Design & 3D visualisation (2)

ProjectScopeClientCityYear
Jazan dangerous-goods inspection shed3D visualisationNot publishedJazan2026
Pool and courtyard for a private villaDesign & 3D visualisationPrivate villaNot publishedNot published

Industrial & rope access (1)

ProjectScopeClientCityYear
Port crane repainting by rope accessIndustrial facilityNot publishedJazanNot published

Projects marked "design proposal" or "3D visualisation" are design work with no construction stated. The register is updated with every new project published on the site.

Need a project like these?

Send the drawings or a short brief and get a quotation within one working day.

Request a quotation