Saudi Arabia · Egypt Client portal +966 59 700 9855 a.fathy@arabcreators.co
Arab Creators Engineering Consultancy

Technical study and pricing · gypsum and acoustic ceilings

Gypsum and Acoustic Ceilings for an Opera House in Diriyah

Technical study, quantity takeoff and pricing of the gypsum, ceilings, partitions and acoustic linings package for an opera house in Diriyah, covering VIP lounges, the lobby, curved corridors and rehearsal rooms. Design images are from the project documents and published with permission.

Royal lounge: stepped ceiling, gypsum curves and concealed lighting Diriyah · 2026
VIP lounge with a multi-level sculpted gypsum ceiling Diriyah · 2026
Lobby with a wave timber ceiling and a relief wall Diriyah · 2026
Curved VIP corridor with curved walls, ceiling and linear lighting Diriyah · 2026
Royal entrance Diriyah · 2026
Royal boxes in the hall Diriyah · 2026
Large rehearsal room with acoustic wall and ceiling panels Diriyah · 2026
Dance rehearsal room Diriyah · 2026
Small practice room with a grooved acoustic wall Diriyah · 2026
Suspended acoustic reflectors over the stage Diriyah · 2026

What the study covered

  • Reading the specification, drawings and technical query log for the package.
  • Quantity takeoff of gypsum and acoustic ceilings, partitions and linings.
  • Unit rate analysis comparing the systems and manufacturers named in the specification.
  • Code and approval registers required for each system before supply.

Describes our role in the study, not the scope of the project works.

Related services

:

Contact us

Discuss your project with us

Send your drawings or a short project brief, and we will respond with a scope of work and a quotation.

Saudi Arabia: mobile & WhatsApp +966 59 700 9855
Egypt: mobile & WhatsApp Business +20 111 256 5999
Riyadh Site visits and project coordination
Working hours Sunday to Thursday, 9:00 to 18:00 Riyadh time
Contact card Save to contacts