Category: Quantities & pricing
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Opening deduction calculates net blockwork, plaster or paint quantities. The contract defines deductible openings and treatment of reveals, heads and sills; one deduction rule does not suit every trade.
Why it matters on a project
Net masonry and net finish areas can differ on the same wall because their scope and returns differ.
Measurement and pricing
Link openings to the door and window schedule, recording size, count and deduction basis. Add returns only as the measurement method requires.
Worked example
A wall face is 8 × 3 = 24 m² with two windows, each 1.2 × 1.5 = 1.8 m²: deduction is 2 × 1.8 = 3.6 m² and net is 24 − 3.6 = 20.4 m², assuming both openings are deductible and returns are excluded from this example.
Common mistake
Deducting both faces of a doorway from a single-face item or overlooking plaster to its reveals.
Frequently asked questions
Are small openings deducted?
Use the item's measurement rules, not a threshold from another contract.
Are reveals part of the flat face area?
No. Their treatment follows the item description and measurement rules.
Related terms
- Method of measurementThe agreed rules for measuring each BOQ item.
- Door and window scheduleA table giving the code, size and specification of every door and window.
- Quantity take-offExtracting quantities from drawings under defined measurement rules, with a reference for every figure.
Read next
- Quantity Takeoff for Contractors, Step by Step
- Work out quantities with our free calculators: concrete, tiles, paint and plaster. Open the calculators
Does your project need quantity take-off and BOQ pricing? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote