Centreline measurement

القياس على خط المنتصف

Measuring lengths along element centrelines with junction adjustments.

Category: Quantities & pricing

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Centreline measurement is used for regular elements such as ground beams or constant-width trenches. Junctions, ends and section changes require adjustments to avoid counting shared volumes twice.

Why it matters on a project

It speeds up repeated measurement while keeping the relationship between length and section clear.

Measurement and pricing

Check each route length, width and depth, separate different sections and document junction deductions under the measurement boundaries.

Worked example

A straight trench without junctions is 24 m long, 0.60 m wide and 0.80 m deep: volume is 24 × 0.60 × 0.80 = 11.52 m³. Side slopes and working space are excluded from this example.

Common mistake

Adding intersecting beam lengths and multiplying by section without deducting the shared volume.

Frequently asked questions

When is centreline length insufficient?

At section changes, intersections or slopes; split the elements and calculate adjustments.

Is centreline length the outside face length?

No. They differ at corners and ends, so state the measurement basis.

Related terms

  • Ground beam (tie beam)A ground-level beam tying the footings and carrying walls at ground level.
  • ExcavationRemoving soil down to the required foundation level.
  • Measurement sheetA sheet recording the dimensions and calculation behind each quantity.