Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Door threshold detail

تفصيلة عتبة الباب

A section coordinating levels, waterproofing and finishes beneath a door.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A threshold detail shows adjoining floor levels, threshold height, waterproofing, seals and effects on door swing and passage. External entrances also require coordination of water drainage outside the door.

Why it matters on a project

It addresses a common rain-entry and trip location at transitions between inside and outside.

Measurement and pricing

Check levels, falls, waterproofing continuity and frame drainage openings, then trial door operation and review project accessibility requirements.

Worked example

Internal finish is at 0.00 m and external finish at minus 0.04 m: difference is 0.00 − (−0.04) = 0.04 m, or 0.04 × 1000 = 40 mm. This only describes the difference; transition, waterproofing and accessibility require separate review.

Common mistake

Raising the threshold to stop water without checking passage requirements, or blocking frame drain openings with mortar.

Frequently asked questions

Does a raised threshold alone stop rain?

No. Coordinate falls, waterproofing, frame seals and drainage.

Can the level difference be removed?

A suitable accessible drainage detail may be designed, but do not remove it without design review.

Related terms

  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
  • Door clear opening widthThe actual available passage width after door and frame installation.
  • Universal accessDesigning buildings everyone can use, including people with disabilities.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote