Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Door clear opening is the unobstructed passage width at the opening position required by the applicable measurement method. It differs from leaf width and masonry opening and is affected by frame, leaf, hinges and obstructions.
Why it matters on a project
It affects furniture movement, accessibility and exit routes and needs checking when the door is selected.
Measurement and pricing
Measure between the defined boundaries at the required opening angle, checking obstructions and project requirements.
Worked example
Width between the relevant frame boundaries is 900 mm, with 55 mm total leaf and obstruction projection in the measurement position: clear width is 900 − 55 = 845 mm. Check the project requirement; this example does not establish acceptance.
Common mistake
Buying a leaf equal to the required passage width and assuming the installed clear width will be identical.
Frequently asked questions
Is the masonry opening the clear width?
No. Frame, leaf and installation details reduce available passage.
Is the door measured closed?
Use the opening position required by the applicable method and account for obstructions.
Related terms
- Timber doorsInternal doors in solid or engineered timber with frame and hardware.
- Door and window scheduleA table giving the code, size and specification of every door and window.
- Universal accessDesigning buildings everyone can use, including people with disabilities.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote