Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Joinery shop drawing

مخطط ورشة النجارة

Fabrication and installation details for fitted joinery.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A joinery shop drawing defines sections, materials, thicknesses, joints, hardware and door swings. Dimensions are coordinated with the finished site survey, services and appliances.

Why it matters on a project

It prevents cabinets that cannot accommodate appliances or obstruct electrical outlets.

Measurement and pricing

Check overall and clear dimensions, side thicknesses, clearances and unit identifiers before releasing cutting lists.

Worked example

For a 900 mm overall unit with two 18 mm sides, internal width is 900 − 2 × 18 = 864 mm before hardware clearances.

Common mistake

Sending architectural dimensions to fabrication without surveying completed finishes.

Frequently asked questions

Can fabrication follow a perspective alone?

No. Approved sections, dimensions, materials and clearances are required.

When is the site surveyed?

Once actual reference surfaces are established, recording any unfinished layers.

Related terms

  • Kitchen cabinetsKitchen base and wall units with worktops and fittings.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • Equipment access clearanceSpace needed to reach equipment and remove its components safely.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote