Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A cabinet carcass comprises sides, base, back and dividers. Board type, joints and wall fixings depend on loading and moisture exposure.
Why it matters on a project
Its squareness and stiffness control door gaps and drawer operation.
Measurement and pricing
Check thicknesses, diagonals, back and shelf fixing, and the anchors supporting suspended units.
Worked example
An 864 mm clear interior divided by an 18 mm central panel gives (864 − 18) ÷ 2 = 423 mm per equal bay. Runner clearances are checked separately.
Common mistake
Treating a thin back panel alone as adequate support for a loaded wall cabinet.
Frequently asked questions
Does greater thickness guarantee acceptance?
No. Board type, joints, span and load also matter.
Can it be installed in a damp site?
Check the material's required moisture and storage conditions before installation.
Related terms
- Kitchen cabinetsKitchen base and wall units with worktops and fittings.
- Joinery shop drawingFabrication and installation details for fitted joinery.
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote