Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
The schedule identifies hinges, runners, handles and lifting mechanisms by code, size and quantity. Check compatibility with door weight, board thickness and opening arrangement.
Why it matters on a project
Similar-looking hinges need not have the same opening angle or capacity.
Measurement and pricing
Match installed codes to approval and test movement under the manufacturer's specified load.
Worked example
An example approved schedule assigns 3 hinges to each of 12 doors: 12 × 3 = 36 hinges. This quantity is not a hinge-capacity design rule.
Common mistake
Selecting a drawer runner by length alone without load rating and installation clearance.
Frequently asked questions
Is soft-close a sufficient specification?
No. Identify code, capacity, opening angle and compatibility.
Is a similar-looking substitute acceptable?
Review performance, dimensions and approval before substitution.
Related terms
- Joinery shop drawingFabrication and installation details for fitted joinery.
- Door and window scheduleA table giving the code, size and specification of every door and window.
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.