Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Timber moisture affects dimensional change after installation. Compare readings with material requirements and service conditions, allowing appropriate conditioning before fabrication or installation.
Why it matters on a project
Wet timber may shrink and open joints after fitting.
Measurement and pricing
Use a meter suited to the species with required corrections, or the specified oven-dry reference method.
Worked example
A specimen weighs 550 g before reference drying and 500 g afterward: water mass is 550 − 500 = 50 g and moisture content is 50 ÷ 500 × 100 = 10%. This is not a universal acceptance limit.
Common mistake
Accepting one surface reading or one universal limit for every timber and environment.
Frequently asked questions
Is the percentage based on wet mass?
Under this definition it is based on dry mass.
Does species affect meter readings?
Yes. Apply the appropriate material settings and corrections.
Related terms
- Timber doorsInternal doors in solid or engineered timber with frame and hardware.
- Parquet (wood flooring)Natural or engineered wood flooring laid over an underlay.
- Substrate moisture testAssessing substrate moisture before a moisture-sensitive finish is installed.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote