Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Stone drip groove

مجرى تقطير الحجر

An underside groove interrupting water tracking back beneath stone.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A drip groove works with surface slope, projection and facade termination. Locate it beyond the protected face while maintaining stone thickness and capacity.

Why it matters on a project

It reduces water tracking and staining but does not replace waterproofing or flashing.

Measurement and pricing

Check continuity, position, slope and water path against the detail.

Worked example

On a 1.8 m sill, the example groove stops 0.05 m from each end: length is 1.8 − 2 × 0.05 = 1.7 m. Review water tracking at both terminations.

Common mistake

Locating the groove behind the wall face or cutting near a fixing and weakening the stone.

Frequently asked questions

Does it replace surface slope?

No. It works with slope, projection and sealing.

Can any groove depth be used?

No. Coordinate depth with stone thickness, anchors and fabrication limits.

Related terms

  • Stone claddingCovering facades with natural stone panels fixed to the building.
  • Door threshold detailA section coordinating levels, waterproofing and finishes beneath a door.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote