Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Setting blocks transfer glass weight to designed supports without hard edge contact. Specify dimensions, material, hardness and sealant compatibility.
Why it matters on a project
Unsuitable blocks can create local stress or obstruct drainage.
Measurement and pricing
Check positions, dimensions, support of the glazing unit and clear drainage routes.
Worked example
An example detail specifies two setting blocks for each of 18 panes: 18 × 2 = 36 blocks. Block dimensions and positions follow the system design.
Common mistake
Using improvised timber pieces or supporting only one pane of an insulating glass unit.
Frequently asked questions
Can scrap rubber be used?
No. Material, hardness and compatibility need verification.
Can a block obstruct drainage?
Locate it so the designed drainage route remains open.
Related terms
- Double glazingTwo glass panes with an air or gas gap to insulate heat and sound.
- Aluminium windowsWindows with aluminium frames, sliding or hinged, single or double glazed.
- Curtain wallA glazed facade hung on an aluminium frame that carries no building load.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote