Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Edge clearance accommodates tolerances and movement while preventing glass-to-frame contact. It differs from glass bite behind the sightline and from face clearance.
Why it matters on a project
Too little can damage edges; excessive clearance can reduce required engagement.
Measurement and pricing
Check glass and rebate dimensions, block positions, tolerances and movement under the system detail.
Worked example
Opposed rebate bases are 1020 mm apart and glass is 1008 mm wide: total clearance is 1020 − 1008 = 12 mm, or 12 ÷ 2 = 6 mm per side when centred. Check bite separately.
Common mistake
Subtracting a fixed value from the visible opening without checking the frame section.
Frequently asked questions
Is it measured from the sight opening?
No. Use a section showing rebate and glass edge.
Is nominal clearance enough?
Also assess tolerances, movement and actual positioning.
Related terms
- Glazing setting blockA block supporting glass weight and separating it from the frame.
- Construction tolerancesPermitted deviations from specified dimensions or positions.
- Double glazingTwo glass panes with an air or gas gap to insulate heat and sound.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote