Construction tolerances

سماحات التنفيذ

Permitted deviations from specified dimensions or positions.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Construction tolerances define acceptable deviations in position, level, plumb, flatness and size. Each has a reference and measurement method; system interfaces may need tighter control than individual elements.

Why it matters on a project

They support objective acceptance and coordination between structure, facades and finishes.

Measurement and pricing

Record design value, measured value, deviation and method, assessing accumulated deviations at interfaces.

Worked example

Design size is 1200 mm and actual size is 1196 mm: deviation is 1196 − 1200 = −4 mm. If this example alone permits ±5 mm, the dimension falls within that limit, with other checks still required.

Common mistake

Accepting elements individually while their combined deviations prevent installation of a door or facade.

Frequently asked questions

Does a tolerance permit redesign?

No. It accepts specified execution variation, not an intentional dimension change.

Can tolerances accumulate?

Yes. Assess their combined effects where systems meet.

Related terms

  • Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.
  • Mock-upA full-size sample built to approve appearance and quality before full production.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.

Read next

Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote