Category: Safety & quality
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Fresh concrete temperature affects reaction rate, workability loss, placing and curing conditions. It is measured in the concrete itself, not inferred from air or truck surface temperature.
Why it matters on a project
It helps assess a load and hot-weather placing plan against the approved specification.
Measurement and pricing
Use the specified test method and a calibrated instrument in a representative sample, recording time, location and the applicable project criterion.
Worked example
Two illustrative readings for the same load are 31 and 33 degrees Celsius at different times: change is 33 − 31 = 2 degrees Celsius. Record timing and context and compare the required reading with the project criterion.
Common mistake
Applying a universal acceptance value without the mix and specification or adding water arbitrarily to address heat effects.
Frequently asked questions
Can air temperature replace the test?
No. Concrete can differ from ambient conditions and must be measured as specified.
Should water be adjusted to lower temperature?
No arbitrary adjustment is allowed; follow the authorized procedure and record any permitted change.
Related terms
- Concrete admixturesChemicals added to concrete to improve its properties.
- CuringKeeping concrete moist and at temperature after pouring so it reaches its design strength.
- Slump testA simple site test measuring the consistency and workability of fresh concrete.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote