Concrete delivery ticket

بطاقة توريد الخرسانة

A record linking a concrete load to its mix, quantity and delivery times.

Category: Safety & quality

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A concrete delivery ticket identifies the load, producer, specified mix, volume and supplier-recorded batching and delivery information. Link it to site tests, pour location and any authorized load adjustments.

Why it matters on a project

It traces a test result to the load and element receiving it instead of treating all daily pours as identical.

Measurement and pricing

Match mix details to approval and record received volume, event times, test results and load disposition.

Worked example

Three accepted loads are recorded as 7, 7 and 6 m³: total is 7 + 7 + 6 = 20 m³. Reconcile with the pour record; the delivery total alone does not measure the finished element.

Common mistake

Signing before checking mix identity or losing the link between specimens and pour locations.

Frequently asked questions

Is a ticket a strength certificate?

No. It identifies the load and links it to required checks and test results.

Is all delivered volume payable?

Payment follows contract measurement rules, with rejected, returned and lost volume recorded.