Category: Safety & quality
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Verticality checking compares element position at different elevations against a plumb reference. It applies to columns, walls and facades during and after installation, distinguishing overall lean from local surface irregularity.
Why it matters on a project
It supports formwork correction before pouring and checks effects on finishes and adjoining elements.
Measurement and pricing
Measure horizontal deviation and reference height with suitable equipment, then compare with the approved tolerance for the element and stage.
Worked example
Measured horizontal deviation is 6 mm over 3000 mm height: deviation ratio is 6 ÷ 3000 × 100 = 0.2%. This ratio alone does not establish acceptance; check element tolerances and method.
Common mistake
Accepting a column from one face while overlooking lean in the perpendicular direction.
Frequently asked questions
Is one direction enough?
Check the directions needed to detect lean, commonly two perpendicular directions for ordinary elements.
Is checking before pouring enough?
Check during form adjustment and after construction as required by the plan and element condition.
Related terms
- Inspection request (IR)A formal request from the contractor to the consultant to inspect work before the next stage.
- ColumnA vertical element that carries slab and beam loads down to the footings.
- FormworkTemporary moulds that hold concrete until it hardens.
Read next
Does your project need engineering consultancy and project management? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote