Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Laminated glass combines specified glass plies and interlayers. Glass type, interlayer, support and temperature influence performance; not every makeup suits a barrier.
Why it matters on a project
Fragment retention is distinct from verified post-breakage structural capacity.
Measurement and pricing
Match ply thicknesses, makeup, certificates, edges and support to the approved application.
Worked example
An illustrative makeup has two 6 mm plies and a 1.52 mm interlayer: nominal thickness is 6 + 1.52 + 6 = 13.52 mm. This sum does not verify strength or barrier suitability.
Common mistake
Substituting monolithic toughened glass merely because overall thickness is similar.
Frequently asked questions
Is it insulating double glazing?
No. A bonded interlayer differs from an insulating-unit cavity.
Will it carry load after breakage?
That depends on design, interlayer, support and temperature and needs specific verification.
Related terms
- Glass partitionInternal walls of toughened glass that divide offices and spaces.
- Double glazingTwo glass panes with an air or gas gap to insulate heat and sound.
- Material submittalA request to approve a material or product with manufacturer data and samples before supply.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote