Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Sensible heat ratio

نسبة الحرارة المحسوسة

Sensible cooling divided by total cooling.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

SHR describes the sensible portion of a load or capacity. Room-load SHR and coil-capacity SHR need not match automatically because outdoor air and operating conditions affect the balance.

Why it matters on a project

An unsuitable capacity split may control temperature but leave humidity high.

Measurement and pricing

Compare loads and capacities on the same basis at the specified temperatures, humidity and airflow.

Worked example

Sensible load is 8 kW and latent load 2 kW: total is 8 + 2 = 10 kW and SHR is 8 ÷ 10 = 0.8. Compare equipment output at the same selection conditions.

Common mistake

Comparing room SHR directly with catalogue SHR at unrelated rating conditions.

Frequently asked questions

Is SHR a capacity unit?

No. It is dimensionless.

Does it change with air conditions?

Yes. Air state, airflow and coil operation affect capacity SHR.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote