Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Sensible cooling load

حمل التبريد المحسوس

The cooling-load component associated with lowering air temperature.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Sensible load includes transmission, solar gain, equipment and portions of people and outdoor-air loads. Assess it at specified design conditions and coincident demand.

Why it matters on a project

Meeting total capacity does not necessarily meet the required sensible duty.

Measurement and pricing

Check load sources, temperatures, airflow and equipment sensible capacity at operating conditions.

Worked example

For an approximate dry-air calculation, density is 1.2 kg/m³, flow 0.5 m³/s, specific heat 1.005 kJ/(kg.K) and temperature difference 10 K, equivalent to a 10-degree Celsius difference. Sensible duty is 1.2 × 0.5 × 1.005 × 10 = 6.03 kW. This alone is not a complete room-load calculation.

Common mistake

Using floor area alone while ignoring glazing, orientation, insulation and occupancy.

Frequently asked questions

Does it include moisture removal?

No. Moisture-related latent load is treated separately.

Does villa orientation matter?

Yes. It affects solar exposure, glazing gains and coincident loads.

Related terms

  • Cooling loadThe heat the air conditioning must remove from a space.
  • Duct airflow rateThe volume of air passing a section per unit time.
  • Thermal insulationMaterials reducing heat transfer through walls and roofs, required by the Saudi Building Code.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote