Duct airflow rate

معدل تدفق الهواء

The volume of air passing a section per unit time.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Airflow rate is air volume passing per unit time, expressed in cubic metres per second, litres per second or another stated unit. It relates to cross-sectional area and average velocity and differs from room cooling load.

Why it matters on a project

It determines air distribution between spaces and supports checks of ducts and outlets against design.

Measurement and pricing

Use a suitable instrument and traverse method or an outlet capture hood, recording units and operating conditions.

Worked example

Clear internal section is 0.40 × 0.25 = 0.10 m² with assumed average velocity 4 m/s: airflow is 0.10 × 4 = 0.40 m³/s, or 0.40 × 1000 = 400 L/s.

Common mistake

Using one velocity reading near the duct edge as the average across the whole section.

Frequently asked questions

Is airflow the same as cooling capacity?

No. Capacity also depends on air-state differences and properties.

Can outlet flows be added?

Add outlets within the same branch and operating condition, then compare with measurement and design.