Pipe sleeve

جلبة مرور المواسير

A casing forming a passage for a pipe through a building element.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A pipe sleeve is a casing through a wall or slab that locates a penetration and provides space around the service. It does not by itself provide waterproofing or fire resistance; an appropriate sealing detail is required.

Why it matters on a project

It enables planned installation and separates passage requirements from the design of the surrounding seal.

Measurement and pricing

Check internal size, position, level, length and fixing, matching annular space to the specified water or fire sealing system.

Worked example

A sleeve has 160 mm internal diameter around a centred, uninsulated service with 110 mm outside diameter: radial gap is (160 − 110) ÷ 2 = 25 mm. The sealing system still needs to cover that gap.

Common mistake

Filling any sleeve gap with general-purpose foam and treating it as an approved water and fire seal.

Frequently asked questions

Does a sleeve alone stop water?

No. Provide a sealing and waterproofing detail suited to the penetration.

Is the gap uniform around an angled pipe?

Not necessarily. Check actual minimum and maximum gaps under the sealing system requirements.

Related terms

  • Sleeve scheduleA schedule linking each sleeve or opening to location, size and service.
  • Builders work drawingA drawing locating civil provisions needed for building services.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.