Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A condensate drain carries water from the AC drain pan to a suitable project discharge point. Coordinate fall, cleaning and insulation; trap requirements and dimensions depend on unit pressure and manufacturer instructions.
Why it matters on a project
Blockage or poor fall can cause leaks above a gypsum ceiling after the AC starts.
Measurement and pricing
Inspect route, supports, insulation and discharge point and perform a flow and operating check before ceiling closure.
Worked example
A 7 m horizontal condensate run with an assumed approved example gradient of 1% needs 7 × 1 ÷ 100 = 0.07 m fall. Also coordinate trap space, insulation and supports.
Common mistake
Copying a trap detail from a different unit or terminating the line where it wets the facade.
Frequently asked questions
Does every unit need the same trap?
No. Need and dimensions follow unit type, pressure and manufacturer instructions.
When should drainage be checked?
Before ceiling closure and during commissioning, checking leakage and flow under the required operating condition.
Related terms
- Cooling loadThe heat the air conditioning must remove from a space.
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.
- Suspended (false) ceilingA secondary ceiling hung below the structural slab to conceal services and improve acoustics and lighting.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote