Floor drain trap

السيفون المائي لصفاية الأرضية

A component retaining water to form a barrier against drain gases.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A water-seal trap retains water in the drainage path to separate room air from sewer gases. Evaporation, siphonage or drainage pressure can reduce the seal, so venting and replenishment must be considered.

Why it matters on a project

A missing or dry seal can cause odours even where drainage pipes do not leak.

Measurement and pricing

Check trap type and design seal depth, then test discharge, water retention and cleaning access after finishing.

Worked example

An infrequently used bathroom smells without visible leakage. Check trap water, drainage venting and replenishment before proposing finish replacement.

Common mistake

Masking odours or permanently blocking the drain instead of investigating the trap and venting.

Frequently asked questions

Can drying alone cause odour?

Yes, but it is not the only cause; also check connections and venting.

Should a second trap be added as backup?

Do not add one arbitrarily; double trapping can impede drainage and requires design review.

Related terms

  • Sanitary wareWCs, basins, mixers, showers and accessories.
  • MEP drawingsElectrical, plumbing, HVAC and fire drawings.
  • ManholeA chamber on a drain line for cleaning and inspection at junctions and bends.