Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Drain cleanout

فتحة تسليك الصرف

A removable sealed access point for cleaning a drain.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A cleanout is a fitting or opening with a removable sealed cover for inserting drain-cleaning equipment. Its location, orientation, size and access space follow the drainage design and project requirements.

Why it matters on a project

It enables blockage removal without breaking finishes or dismantling unsuitable sanitary connections.

Measurement and pricing

Check that the cover can be removed and cleaning equipment inserted after finishes, and verify sealing and drawing location.

Worked example

A cleanout sits behind a kitchen cabinet. Before cabinet installation, coordinate an access door that permits cover removal and cleaning-tool entry, then physically trial access.

Common mistake

Concealing a cleanout behind fixed cabinetry or tiling over it without suitable access.

Frequently asked questions

Can a floor drain always replace a cleanout?

No. It depends on the route and fitting; check the designated cleaning access.

Should its cover be left loose?

No. Keep it sealed and removable as designed to prevent water and odour leakage.

Related terms

  • ManholeA chamber on a drain line for cleaning and inspection at junctions and bends.
  • MEP drawingsElectrical, plumbing, HVAC and fire drawings.
  • Sanitary wareWCs, basins, mixers, showers and accessories.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote