Sleeve schedule

جدول الجلب والفتحات

A schedule linking each sleeve or opening to location, size and service.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A sleeve schedule assigns each penetration an identifier, floor, grid position, level, service and internal diameter or clear opening dimensions. It also records applicable waterproofing and firestopping requirements.

Why it matters on a project

It consolidates discipline requirements into one list that can be checked before concrete placement.

Measurement and pricing

Reconcile quantities and dimensions with coordinated drawings and site measurements, distinguishing pipe outside diameter from sleeve inside diameter.

Worked example

A floor has 18 drainage, 10 water supply and 6 other sleeves: 18 + 10 + 6 = 34 sleeves. Inspect each type by size and position, not only the total count.

Common mistake

Selecting sleeves from nominal pipe size without considering insulation, clearance and the penetration sealing system.

Frequently asked questions

Are sleeve and pipe sizes identical?

Not necessarily. Sleeve internal dimensions must accommodate the service envelope and required clearance.

How is a sleeve tracked on site?

Use an identifier matching the schedule and drawing, with floor, grids and level.