Definition
Duct velocity relates airflow to free internal section area. It affects pressure loss and noise, so the designer selects the section for system performance and available space.
Why it matters on a project
Reducing a duct to pass beneath a beam can raise velocity and pressure loss and affect delivered airflow.
Measurement and pricing
Divide flow rate by clear area, converting units and allowing for internal lining, then compare with the design.
Worked example
Airflow of 600 L/s is 600 ÷ 1000 = 0.60 m³/s. With clear section 0.50 × 0.30 = 0.15 m², velocity is 0.60 ÷ 0.15 = 4 m/s. Section adequacy still requires pressure-loss and noise checks.
Common mistake
Using outside dimensions for a lined duct or mixing litres per second with cubic metres per second.
Frequently asked questions
Is one velocity suitable for every duct?
No. Consider system type, duct location, noise and pressure loss.
What does internal lining change?
It reduces free area unless the stated dimensions are already clear of the lining.
Related terms
- Duct airflow rateThe volume of air passing a section per unit time.
- Cooling loadThe heat the air conditioning must remove from a space.
- Clash detectionChecking models to find where disciplines collide before construction.