Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A coordinated services drawing combines ducts, pipes and cable trays with structure and architectural ceilings. It includes external dimensions, insulation, supports and access zones, with sections through congested areas.
Why it matters on a project
It identifies a route that cannot pass below a beam or a valve that will become inaccessible after ceiling closure.
Measurement and pricing
Check levels against one datum and measure gaps between external insulated surfaces. Reconcile sections with plans.
Worked example
Beam soffit is at 3.20 m and the bottom of an insulated service is at 2.80 m with 0.30 m external height: its top is 2.80 + 0.30 = 3.10 m, leaving 3.20 − 3.10 = 0.10 m. Check supports and installation needs before accepting the route.
Common mistake
Accepting an apparently clear plan without checking a vertical section through the services.
Frequently asked questions
Which duct level should be shown?
State whether it is bottom, top or centreline and whether insulation is included.
Does coordination replace load calculations?
No. It coordinates the designed solution and does not replace design calculations.
Related terms
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.
- Clash detectionChecking models to find where disciplines collide before construction.
- Reflected ceiling planA drawing of suspended ceilings, their levels, lights and diffusers.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote