Drawing status code

رمز حالة المخطط

A code stating why a drawing is issued and how it may be used.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A drawing status code indicates coordination, review or construction use under the project's agreed code list. Status differs from revision and can change while the drawing title stays the same.

Why it matters on a project

It prevents use of drawings outside their authorized purpose and makes review responses understandable to procurement and site teams.

Measurement and pricing

Match the code on the drawing, register and transmittal to the project procedure. Read any conditions attached to the status before releasing work.

Worked example

The latest coordination drawing cannot support a duct fabrication release until its review is complete and its recorded status allows that use under the project procedure.

Common mistake

Assuming a letter means approved on every project, or that a status cancels the comments accompanying it.

Frequently asked questions

Is revision the same as approval status?

No. Revision identifies the version; status identifies purpose or permitted use.

How should an unfamiliar code be interpreted?

Use the project's document status guide, not a convention from another project.

Related terms

  • Drawing registerA list controlling drawing numbers, revisions and review status.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.
  • Drawing revisionA number and date that identify each changed version of a drawing.