Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Revision cloud

سحابة التعديل

A graphic boundary locating a change on a drawing.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A revision cloud surrounds changed content and is linked to a revision marker and change description. It communicates the affected area but does not replace comparing revisions.

Why it matters on a project

It directs the site team to a changed opening or level without searching the entire sheet again.

Measurement and pricing

Compare clouds and markers with the revision table and actual file differences. Remove old clouds according to the project rule while preserving earlier issues.

Worked example

A services opening level changes. Cloud the opening, add the revision marker, describe the change in the revision table and update the related builders work drawing.

Common mistake

Changing a critical dimension without a cloud or description, allowing the site team to continue using the old dimension.

Frequently asked questions

Does a cloud mean the change is accepted?

No. It is a graphic aid; acceptance follows drawing status and review procedures.

Can clouds identify every change?

No. Compare revisions as well because a change may accidentally be left unclouded.

Related terms

  • Drawing revisionA number and date that identify each changed version of a drawing.
  • Drawing registerA list controlling drawing numbers, revisions and review status.
  • Detail drawingA large-scale drawing showing how a specific part is built.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote