Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Drawing register

سجل المخططات

A list controlling drawing numbers, revisions and review status.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A drawing register links each drawing number to its title, discipline, revision, issue date and review response. It preserves revision history and identifies the version available for construction under the project procedure.

Why it matters on a project

It helps the contractor's technical office find missing sheets and obsolete revisions before issuing a work package to site.

Measurement and pricing

Reconcile the register against each transmittal and the actual files. Row count is not drawing count when each revision has a separate row.

Worked example

A package has 36 unique drawings, with 29 released for construction in the register: 36 − 29 = 7 drawings remain for status follow-up.

Common mistake

Treating the latest upload date as permission to build when the drawing is still issued for review.

Frequently asked questions

Should an old revision be deleted from the register?

Keep its history and mark it superseded so it is not distributed as current.

Does the register replace drawing checks?

No. It controls documents; dimensions and technical content still require drawing review.

Related terms

  • Drawing revisionA number and date that identify each changed version of a drawing.
  • Title blockThe sheet's data box: project, number, scale and revision.
  • Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote