Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A drawing register links each drawing number to its title, discipline, revision, issue date and review response. It preserves revision history and identifies the version available for construction under the project procedure.
Why it matters on a project
It helps the contractor's technical office find missing sheets and obsolete revisions before issuing a work package to site.
Measurement and pricing
Reconcile the register against each transmittal and the actual files. Row count is not drawing count when each revision has a separate row.
Worked example
A package has 36 unique drawings, with 29 released for construction in the register: 36 − 29 = 7 drawings remain for status follow-up.
Common mistake
Treating the latest upload date as permission to build when the drawing is still issued for review.
Frequently asked questions
Should an old revision be deleted from the register?
Keep its history and mark it superseded so it is not distributed as current.
Does the register replace drawing checks?
No. It controls documents; dimensions and technical content still require drawing review.
Related terms
- Drawing revisionA number and date that identify each changed version of a drawing.
- Title blockThe sheet's data box: project, number, scale and revision.
- Shop drawingsDrawings prepared by the contractor or fabricator showing how items are made and installed, approved by the consultant before execution.