Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Latent load arises from moisture introduced by people, infiltration, ventilation and wet activities. Review it alongside coil conditions, airflow and humidity control.
Why it matters on a project
A cool room can remain humid if required moisture removal is not achieved.
Measurement and pricing
Estimate moisture sources and compare removal capacity, coil conditions and condensate drainage with design requirements.
Worked example
Removing 1.44 kg/h of water gives 1.44 ÷ 3600 = 0.0004 kg/s. Using approximate latent heat 2500 kJ/kg gives 0.0004 × 2500 = 1 kW. The coefficient is approximate and depends on thermal conditions.
Common mistake
Oversizing arbitrarily while ignoring short cycling and its humidity effects.
Frequently asked questions
Does humidity only indicate insufficient total capacity?
No. Also review ventilation, controls, coil conditions and cycling.
Does drain water alone measure design load?
Not without stable measurements and assessment of other influences and design demand.
Related terms
- Cooling loadThe heat the air conditioning must remove from a space.
- Condensate drainA line removing condensed water from an air-conditioning unit.
- Sensible cooling loadThe cooling-load component associated with lowering air temperature.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote