Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A pressure vessel supplies a drawdown volume before the pump restarts under its controls. Drawdown depends on nominal volume, precharge and cut-in and cut-out pressures.
Why it matters on a project
Insufficient drawdown can cause frequent motor starts.
Measurement and pricing
Check drawdown data, required run time, control settings, diaphragm condition and precharge procedure.
Worked example
If vessel data at the selected settings give 24 L drawdown and demand is 6 L/min with the pump off, theoretical supply time is 24 ÷ 6 = 4 minutes. Drawdown cannot be inferred from nominal volume alone.
Common mistake
Assuming a nominal 100 L vessel supplies 100 L between starts.
Frequently asked questions
Do frequent starts prove pump damage?
No. Leakage, incorrect precharge or an unsuitable vessel can contribute; inspect the system.
Is precharge measured with water pressure present?
Follow the manufacturer's isolation and water-side depressurization procedure.
Related terms
- Booster pump duty pointA specified flow and head for pump selection and operation.
- Potable hot-water expansion vesselA vessel accommodating thermal expansion in a closed hot-water system.
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote