Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Potable hot-water expansion vessel

وعاء تمدد المياه الساخنة

A vessel accommodating thermal expansion in a closed hot-water system.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

An expansion vessel uses a suitable diaphragm to separate water from compressible gas. Size it for expansion, operating pressures and precharge; it does not replace a relief valve.

Why it matters on a project

Nominal vessel size exceeds its useful acceptance volume over the operating pressure range.

Measurement and pricing

Check potable-water suitability, temperature, pressure, acceptance volume and the specified precharge measurement procedure.

Worked example

For 200 L initial water volume and an assumed 2% volume expansion: increase is 200 × 0.02 = 4 L. Select a nominal vessel providing this acceptance at the design pressures, not automatically a 4 L vessel.

Common mistake

Equating nominal vessel size with expansion volume or checking precharge with the water side pressurized.

Frequently asked questions

Can a heating vessel serve potable water?

Only where the product is approved and suitable for that service.

Does it replace a relief valve?

No. Their protective functions are different.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote