Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Storage water heater

سخان المياه التخزيني

A heater storing heated water in an insulated tank.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A storage heater serves demand from stored hot water while reheating it. Selection considers usage pattern, recovery and storage, together with support, protection and maintenance.

Why it matters on a project

Tank volume alone does not determine hot-water delivery during peak demand.

Measurement and pricing

Review capacity, heat input, performance data, water conditions, electrical supply and safety provisions against the product and design.

Worked example

For ideal heating energy only, 100 kg of water rises by 30 degrees Celsius using specific heat 4.18 kJ/kg.K: energy is 100 × 4.18 × 30 = 12540 kJ, or 12540 ÷ 3600 = 3.483333 kWh approximately. Losses are excluded; these figures do not set a safe operating temperature.

Common mistake

Selecting only by tank litres or obstructing a safety-valve discharge.

Frequently asked questions

Are litres enough for sizing?

No. Review peak demand, recovery, inlet temperature and distribution.

Can a relief valve be obstructed?

No. Provide protection and discharge according to the heater system and instructions.

Related terms

Read next

Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote