Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
An area schedule links each area to its plan, floor, use and definition, such as net room or gross floor area. Permit area rules come from applicable requirements and are not assumed identical to pricing areas.
Why it matters on a project
It helps review a villa brief and compare revisions without combining differently defined areas.
Measurement and pricing
Check boundaries, double-height voids, stairs, light wells and walls under the chosen definition, then reconcile floor totals with plans.
Worked example
An area schedule using one consistent floor-area definition lists 180 m² ground floor, 165 m² first floor and 45 m² annex: total is 180 + 165 + 45 = 390 m². This sum does not establish permit-counted area without applying its rules.
Common mistake
Mixing net room areas and gross floor areas in one total or counting an open void twice.
Frequently asked questions
Can net and gross areas be mixed?
No. Label each definition and its measurement basis clearly.
Is an upper-floor light-well void floor area?
Check whether a floor exists and the measurement definition; do not automatically repeat the void footprint.
Related terms
- Floor planA drawing of a floor as if cut horizontally at about one metre.
- Building coverage ratioThe share of the plot area that each floor may cover.
- Space programmeThe list of required spaces, their areas and relations before design.
Read next
Does your project need architectural design and construction drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote