Category: Design
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
Instantaneous output depends on heating power and the inlet-to-outlet temperature rise. Review supply requirements and minimum activation flow.
Why it matters on a project
A unit serving one tap may not serve two simultaneous showers at the same temperature.
Measurement and pricing
Compare flow-temperature-rise data with simultaneous demand, inlet conditions and available utility capacity.
Worked example
At 6 L/min and assumed density 1 kg/L, mass flow is 6 ÷ 60 = 0.1 kg/s. For a temperature rise of 25 degrees Celsius and specific heat 4.18 kJ/(kg.K), ideal thermal duty is 0.1 × 4.18 × 25 = 10.45 kW before losses and actual selection requirements.
Common mistake
Using the catalogue's maximum flow without its associated temperature rise.
Frequently asked questions
Is output flow independent of inlet temperature?
No. Available power and required temperature rise limit hot-water flow.
Can any electrical circuit supply it?
The designer must check supply capacity, cable and protection before selection.
Related terms
- Storage water heaterA heater storing heated water in an insulated tank.
- Electrical load scheduleA table summing each board's loads to size breakers, cables and the meter.
- MEP drawingsElectrical, plumbing, HVAC and fire drawings.