Category: Quantities & pricing
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A quantity takeoff audit trail connects a BOQ item to drawings or model elements and a specific location, recording dimensions, calculations, deductions and assumptions. Another checker can reproduce the quantity from the same source.
Why it matters on a project
It helps detect double counting, update quantities after revisions and explain valuation differences.
Measurement and pricing
Trace a sample total through measurement rows to its source and reconcile all zones, accounting for hidden rows or excluded elements.
Worked example
An approved drawing shows a wall 6 m long and 3 m high with a deductible 2 m² opening: gross area is 6 × 3 = 18 m² and net is 18 − 2 = 16 m². Keep dimensions and source reference with the row.
Common mistake
Keeping only the final total without dimensions or revision reference, making changes impossible to explain.
Frequently asked questions
Is highlighting alone sufficient?
No. Record item, location, dimensions and measurement unit.
How should a drawing change be handled?
Identify affected rows and recalculate them while retaining the change history.
Related terms
- Quantity take-offExtracting quantities from drawings under defined measurement rules, with a reference for every figure.
- Measurement sheetA sheet recording the dimensions and calculation behind each quantity.
- Drawing revisionA number and date that identify each changed version of a drawing.
Read next
- Quantity Takeoff for Contractors, Step by Step
- Work out quantities with our free calculators: concrete, tiles, paint and plaster. Open the calculators
Does your project need quantity take-off and BOQ pricing? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote