Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A transom may carry glazing weight through setting blocks and transfer actions to mullions. Its seals, drainage and intersections must remain coordinated.
Why it matters on a project
Deflection or twist affects glass support and joint sealing.
Measurement and pricing
Check spans, connections, block positions, drainage and specified deformation limits.
Worked example
4 bays each have 3 transoms with a detailed cutting length of 1.4 m: count is 4 × 3 = 12 and total length is 12 × 1.4 = 16.8 m before waste.
Common mistake
Adding equipment or finish loads that were not included in its design.
Frequently asked questions
Is cutting length the grid spacing?
Not necessarily; profiles, connections and clearances govern.
Do all transoms carry identical loads?
No. Glazing area, member function and supports can differ.
Related terms
- Curtain wall mullionA vertical framing member in a curtain wall.
- Glazing setting blockA block supporting glass weight and separating it from the frame.
- Curtain wallA glazed facade hung on an aluminium frame that carries no building load.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote