Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Curtain wall mullion

القائم الرأسي للحائط الستائري

A vertical framing member in a curtain wall.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A mullion connects transoms and glazing and transfers actions to anchors as designed. Review splices, inter-storey movement, expansion provisions and drainage paths.

Why it matters on a project

Actual span and anchor positions can govern deflection more than the visible profile shape.

Measurement and pricing

Check approved sections, spans, anchors, engagement and joints against calculations.

Worked example

For a simple uniform-load illustration, assumed wind pressure is 1.2 kN/m² over a 1.5 m tributary width: line load is 1.2 × 1.5 = 1.8 kN/m. Section selection also needs spans, supports, strength and deflection checks.

Common mistake

Assuming a mullion splice provides full moment continuity without a designed detail.

Frequently asked questions

Is tributary width the visible profile width?

No. It is the width of the area delivering load to the member.

Is a profile name sufficient?

Check properties, thickness, alloy, connections and support conditions.

Related terms

  • Curtain wallA glazed facade hung on an aluminium frame that carries no building load.
  • Deflection limitA serviceability criterion for deflection under a stated condition.
  • Anchor boltsBolts set in concrete to fix steel columns and equipment to foundations.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote