Saudi Arabia · Egypt Client portal +966 59 700 9855 info@arabcreators.co
Arab Creators Engineering Consultancy

Cladding cavity

تجويف خلف الكسوة

A space between cladding and backing layers with a defined system function.

Category: Finishes

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

A cladding cavity can provide drainage, ventilation or fixing clearance depending on the system. Coordinate insulation, water barriers, cavity barriers and interfaces.

Why it matters on a project

Mortar debris or poorly coordinated brackets can obstruct drainage or interrupt insulation.

Measurement and pricing

Measure clear width and inspect continuity, drainage outlets and barriers against approved details.

Worked example

The substrate-to-cladding-back distance is 120 mm, including 80 mm insulation: geometric space is 120 − 80 = 40 mm before brackets and tolerances. This is not a cavity-width recommendation.

Common mistake

Assuming every cavity is ventilated or removing a fire barrier to improve airflow.

Frequently asked questions

Is it measured between finished outer faces?

No. Measure the clear space between the specified section layers.

Do barriers interrupt drainage?

Coordinate the detail for both drainage and fire performance without removing required functions.

Related terms

  • Stone claddingCovering facades with natural stone panels fixed to the building.
  • Thermal insulationMaterials reducing heat transfer through walls and roofs, required by the Saudi Building Code.
  • WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.

Read next

Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.

Service detailsRequest a quote