Category: Finishes
Prepared by Eng. Ahmed Fathy, Projects Manager ·
Definition
A weep hole is part of an integrated facade drainage route. Its position, protection and connection to internal chambers follow the system design.
Why it matters on a project
Blocked outlets can turn limited water ingress into trapped water.
Measurement and pricing
Check clean channels, exterior discharge and freedom from sealant blockage, then perform the specified water test.
Worked example
A facade test reveals trapped water behind a cover. Inspection finds sealant blocking the specified outlet; correct it under the system procedure and retest rather than drilling an arbitrary new hole.
Common mistake
Sealing every visible opening as though it were a weather-sealing defect.
Frequently asked questions
Is water leaving the hole a defect?
It can be intended drainage; compare with required system behaviour.
Is counting holes sufficient?
No. Check position, area, water route, protection and actual testing.
Related terms
- Curtain wall transomA horizontal member linking mullions and dividing glazing openings.
- Glazing setting blockA block supporting glass weight and separating it from the frame.
- WaterproofingLayers preventing water ingress into structural elements or spaces, such as bituminous membranes and cementitious coatings.
Read next
Does your project need interior design and finishing drawings? Send the drawings or a short description and we reply within one working day.
Service detailsRequest a quote