Air-conditioner capacity correction

تصحيح قدرة التكييف لظروف التشغيل

Adjusting rated capacity for actual selection conditions.

Category: Design

Prepared by Eng. Ahmed Fathy, Projects Manager ·

Definition

Capacity varies with indoor and outdoor conditions, airflow and, where applicable, refrigerant piping length and lift. Use manufacturer selection data to determine available output.

Why it matters on a project

A nominally rated unit may not deliver that rating at the site's design temperature.

Measurement and pricing

Review rating conditions, selected sensible and latent capacities, operating limits and electrical data.

Worked example

Assume a model-specific manufacturer table gives factor 0.85 for a nominal 14 kW unit at the example condition: available output is 14 × 0.85 = 11.9 kW. This illustrative factor cannot be transferred to another product.

Common mistake

Applying one generic derating factor to all products or multiplying incompatible correction factors.

Frequently asked questions

Is correcting total capacity sufficient?

Also check sensible and latent output, electrical input and operating limits.

Is there one deduction per metre of piping?

No. Follow the model's selection method and tables.

Related terms

  • Cooling loadThe heat the air conditioning must remove from a space.
  • Ton of refrigerationA thermal cooling-capacity unit, not equipment weight.
  • Material submittalA request to approve a material or product with manufacturer data and samples before supply.